1 |
1931340028 | ilham fanandi saputra | 3 TPB | Evaluasi Kinerja Alat Bor Crawler Rock Drill (CRD) Dalam Pembuatan Lubang ledak PT Lotus SG Lestari | PRODI PERTAMBANGAN | Gindang Rain Pratama, ST., MT | | TERDAFTAR | 2022-03-03 00:00:00 | 2022-03-03 21:24:11 |
2 |
1931340027 | WAFIKRON FALAQISSOBA | 3 TPB | Evaluasi Keserasian (Match Faktor) alat gali muat di PT Lotus SG Lestari | PRODI PERTAMBANGAN | Gindang Rain Pratama, ST., MT | | TERDAFTAR | 2022-03-03 00:00:00 | 2022-03-03 21:26:34 |
3 |
1931340025 | Prameswara Diva Syahputra | 3 TPB | Perancangan Geometri Jalan Angkut Batubar Akibat Kenaikan Air Sungai di PT KPP SPUT | KEAIRAN (TPB) | Agus Suhardono, ST., MT | | TERDAFTAR | 2022-03-14 00:00:00 | 2022-03-17 14:03:53 |
4 |
1931340024 | Iqbal Arvy Ardiansyah | 3 TPB | Efektivitas Crushing Plant Batu Andesit terhadap Target Produksi di PT Gunung Padakasih, Site Cangkorah, Kabupaten Bandung Barat, Jawa Barat | PRODI PERTAMBANGAN | Diana Irmawati Pradani, ST., MT | | TERDAFTAR | 2022-03-03 00:00:00 | 2022-03-03 21:28:17 |
5 |
1931340023 | Muhammad Dzulfiqar Sya'roni | 3 TPB | PERHITUNGAN SUMBERDAYA PASIR DENGAN BLOK MODEL DENGAN ESTIMASI INVERSE DISTANCE WEIGHTING PADA BLOK X DESA SUPITURANG KABUPATEN LUMAJANG | PRODI PERTAMBANGAN | Harsalim Aimunandar J., ST., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-18 11:48:49 |
6 |
1931340022 | Mohammad Figo Wicaksana Adi | 3 TPB | Evaluasi Perhitungan Tanah Penutup dan Biaya Jaminan Reklamasi pada PT Muda Mudi Indonesia Kecamatan Jetis Kabupaten Mojokerto Jawa Timur | PRODI PERTAMBANGAN | Gregorius Aryoko G., S.KOM., MT | | TERDAFTAR | 2022-04-20 00:00:00 | 2022-04-24 16:37:14 |
7 |
1931340020 | Prima Aryandi | 3 TPB |
OBSERVASI HASIL FRAGMENTASI PADA KEGIATAN PELEDAKAN DI PT. LOTUS SG LESTARI | PRODI PERTAMBANGAN | Diana Irmawati Pradani, ST., MT | | TERDAFTAR | 2022-03-03 00:00:00 | 2022-03-03 21:41:30 |
8 |
1931340019 | Uzdah Rachmi Gunawan | 3 TPB | Perencanaan Ulang Saluran Drainase Tambang PT. Bina Insanni Selaras, Kabupaten Bandung, Jawa Barat | KEAIRAN (TPB) | Dr. Dra. Utami Retno Pudjowati, MSi | | TERDAFTAR | 2022-03-25 00:00:00 | 2022-03-25 07:28:29 |
9 |
1931340018 | Artha Tsania Kamilati | 3 TPB | OPTIMASI KAPASITAS DISPOSAL TIMUR PIT ALE DENGAN ANALISIS PENGARUH FAKTOR GETARAN PELEDAKAN DI PT. KALIMANTAN PRIMA PERSADA SITE ASAM ASAM | PRODI PERTAMBANGAN | Diana Irmawati Pradani, ST., MT | | TERDAFTAR | 2022-03-14 00:00:00 | 2022-03-17 08:34:41 |
10 |
1931340017 | MUHAMMAD ANUGRAH SIDIK PURNOMO | 3 TPB | PERENCANAAN KEBUTUHAN POMPA PADA TAMBANG BATUBARA DI PIT AGATHIS JOBSITE RANTAU PT KALIMANTAN PRIMA PERSADA | PRODI PERTAMBANGAN | Harsalim Aimunandar J., ST., MT | | TERDAFTAR | 2022-03-14 00:00:00 | 2022-03-16 11:58:12 |
11 |
1931340016 | Miftahul Jannah | 3 TPB | Perencanaan Sistem Penyaliran Tambang Pasir di CV. Putra Mandiri | KEAIRAN (TPB) | Dr. Dra. Utami Retno Pudjowati, MSi | | TERDAFTAR | 2022-03-14 00:00:00 | 2022-03-16 23:53:51 |
12 |
1931340015 | Damar Rakha Dhana | 3 TPB | Pengaruh Geometri Peledakan Terhadap Fragmentasi Batuan PT. Gunung Padakasih | PRODI PERTAMBANGAN | Diana Irmawati Pradani, ST., MT | | TERDAFTAR | 2022-03-14 00:00:00 | 2022-03-15 17:48:48 |
13 |
1931340014 | Muhammad Ghazy Apung Estyawan | 3 TPB | PENERAPAN METODE SAYATAN DAN CONTUR PERHITUNGAN ESTIMASI SUMBERDAYA TANAH URUG PT. CAHAYA AFIF SEJAHTERA SITE REBUG KABUPATEN PURWOREJO PROVINSI JAWA TENGAH | PRODI PERTAMBANGAN | Harsalim Aimunandar J., ST., MT | | TERDAFTAR | 2022-03-14 00:00:00 | 2022-03-14 08:59:33 |
14 |
1931340013 | DAMAR RAKHA DHANI | 3 TPB | ESTIMASI SUMBERDAYA PASIR BATU DENGAN METODE CROSS SECTION DAN METODE CONTOUR DI DESA SUPITURANG, KECAMATAN PRONOJIWO, KABUPATAN LUMAJANG, JAWA TIMUR | PRODI PERTAMBANGAN | Gregorius Aryoko G., S.KOM., MT | | TERDAFTAR | 2022-03-14 00:00:00 | 2022-03-15 09:22:58 |
15 |
1931340012 | Muhammad Romi Amarullah | 3 TPB | Estimasi Sumberdaya Terukur Tanah Urug Menggunakan Metode Penampang dan Metode Kontur Pada PT. Cahaya Afif Sejahtera Purworejo | PRODI PERTAMBANGAN | Harsalim Aimunandar J., ST., MT | | TERDAFTAR | 2022-03-03 00:00:00 | 2022-03-03 21:37:37 |
16 |
1931340011 | Raja Haibah Shidqu | 3 TPB | Pemetaan Potensi Bahan Galian Tanah Urug Menggunakan Sistem Informasi Geografis Pada IUP Eksplorasi PT.Cahaya Afif Sejahtera Purworejo | PRODI PERTAMBANGAN | Helik Susilo, ST., M.Eng | | TERDAFTAR | 2022-03-03 00:00:00 | 2022-03-04 10:50:19 |
17 |
1931340010 | ICHA ROQIQOH DZAKIYYAH | 3 TPB | Analisis Produktivtas Alat Gali Muat (Excavator Kobelco SK200) dan Alat Angkut (Dump Truck Mitsubishi Colt Fuso Diesel 136PS) di CV. Putra Mandiri | MANAJEMEN KONSTRUKSI (TPB) | Dr. Diah Lydianingtias, ST., MM | | TERDAFTAR | 2022-03-04 00:00:00 | 2022-03-04 08:27:52 |
18 |
1931340009 | Rahadewi Netta Maghfiroh | 3 TPB | Pperencanaan dan Optimasi Dewatering Sump Pit ALE Tahun 2022 PT Kalimantan Prima Persada Site Asam-Asam Kalimantan Selatan | PRODI PERTAMBANGAN | Gindang Rain Pratama, ST., MT | | TERDAFTAR | 2022-02-24 00:00:00 | 2022-02-24 19:58:32 |
19 |
1931340008 | Diyan Bagaskara | 3 TPB | ANALISIS KEGIATAN PRODUKSI ALAT GALI MUAT DAN ALAT ANGKUT PADA PERTAMBANGAN BATUANDESIT DI PT. GUNUNG PADAKASIH | PRODI PERTAMBANGAN | Harsalim Aimunandar J., ST., MT | | TERDAFTAR | 2022-03-03 00:00:00 | 2022-03-03 21:37:31 |
20 |
1931340007 | BUNGA PUTRI MILENIA | 3 TPB | Perhitungan Nilai Matching Factor Unit Wheel Loader dengan Barge Loader di PT. Kalimantan Prima Persada Jobsite Sungai Puting
| PRODI PERTAMBANGAN | Gindang Rain Pratama, ST., MT | | TERDAFTAR | 2022-02-24 00:00:00 | 2022-02-24 20:10:08 |
21 |
1931340006 | AUFA RAZZQIA MASYA FORTUNITA | 3 TPB | EFISIENSI EXCAVATOR PC200-8 DAN CATERPILLAR 320 PADA PENAMBANGAN TANAH URUG DI PT MUDA MUDI INDONESIA | PRODI PERTAMBANGAN | Gindang Rain Pratama, ST., MT | | TERDAFTAR | 2022-02-24 00:00:00 | 2022-02-24 20:01:18 |
22 |
1931340004 | Alya Fariidah | 3 TPB | Produktivitas Alat Muat dan Alat Angkut di PT. Bina Insanni Selaras guna Mencapai Target Produksi Harian Pasir Batu | MANAJEMEN KONSTRUKSI (TPB) | Dr. Diah Lydianingtias, ST., MM | | TERDAFTAR | 2022-03-03 00:00:00 | 2022-03-04 08:38:18 |
23 |
1931340003 | Ryan Dwi Prasongko | 3 TPB | IMPLEMENTASI BOTTOM GASBAG DAN EXPAND PATTERN DALAM RANGKA OPTIMALISASI PENGGUNAAN BAHAN PELEDAK YANG BERDEKATAN DENGAN PEMUKIMAN DI PIT AGHATIS PT. KALIMANTAN PRIMA PERSADA JOBSITE RANTAU KABUPATEN TAPIN KALIMANTAN SELATAN | PRODI PERTAMBANGAN | Diana Irmawati Pradani, ST., MT | | TERDAFTAR | 2022-03-03 00:00:00 | 2022-03-03 21:34:58 |
24 |
1931340001 | Aulia Wahyu Fitrannur | 3 TPB | Perbandingan Estimasi Sumberdaya dan Cadangan Metode Cross Section dengan Metode Contour di Lembah Kera, Desa Pagak, Kecamatan Pagak, Kabupaten Malang | PRODI PERTAMBANGAN | Helik Susilo, ST., M.Eng | | TERDAFTAR | 2022-03-03 00:00:00 | 2022-03-07 14:54:23 |
25 |
1931330053 | ANDIKA RESA SAIFULO | 3 TKJJBA 1 | Evaluasi Kinerja Simpang Bersinyal Jalan Brigjend Slamet Riyadi - Jalan Nasional
III Kecamatan Lumajang, Kabupaten Lumajang | TRANSPORTASI (TKJJBA) | Dr. Drs. Burhamtoro, ST., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 13:26:20 |
26 |
1931330052 | JENI OLVIANI | 3 TKJJBA 1 | Identifikasi Risiko Bahaya Dan Pengendalian Bahaya Pada Pekerjaan Pemasangan Jetty Proyek Pembangunan Muara Sungai Bogowonto Sisi Barat (KSN) YIA | MANAJEMEN KONSTRUKSI (TKJJBA) | Indah Ria R., ST., MT | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 12:05:58 |
27 |
1931330051 | RAHMANDA IBADILLAH | 3 TKJJBA 2 | Evaluasi Kinerja Simpang Bersinyal Jalan Dokter Wahidin Sudirohusodo – Jalan Dokter Sutomo Jombang | TRANSPORTASI (TKJJBA) | Ir. Rinto Sasongko, MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 16:48:41 |
28 |
1931330050 | HALIFA ARUM | 3 TKJJBA 2 | RENCANA PENJADWALAN DAN ANGGARAN BIAYA PADA PROYEK PEMBANGUNAN JEMBATAN JONGKE KABUPATEN MAGETAN | MANAJEMEN KONSTRUKSI (TKJJBA) | Radhia Jatu Noviarsita Sakti, ST., MT | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 12:24:43 |
29 |
1931330049 | ABBY FATUR RAHMAN | 3 TKJJBA 1 | Perencanaan ulang Perkerasan Kaku dan Drainase Jalan Akses 1 pada Proyek Bendungan Jlantah di Kabupaten Karanganyar | TRANSPORTASI (TKJJBA) | Achendri M. Kurniawan, SPd., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 13:18:03 |
30 |
1931330048 | Refi Rahmatika Sari | 3 TKJJBA 1 | Metode Pelaksanaan Dan Penjadwalan Underpass Jalan Desa Sta 9+600 pada Tol Solo - Yogyakarta - NYIA Kulonprogo | MANAJEMEN KONSTRUKSI (TKJJBA) | Drs. Susapto, MT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-03-29 20:12:22 |
31 |
1931330047 | IHDA ZAHROTIN NISA' | 3 TKJJBA 1 | Perencanaan Ulang Tanggul Sungai Bogowonto (KSN) YIA | KEAIRAN (TKJJBA) | Ayisya Cindy H. ST., MT | | TERDAFTAR | 2022-03-15 00:00:00 | 2022-03-15 08:40:24 |
32 |
1931330046 | Mohamad Rijalul Fadhil | 3 TKJJBA 1 | Evaluasi Kinerja Simpang Bersinyal Di Jalan Wahid Hasyim Jombang | TRANSPORTASI (TKJJBA) | Marjono, ST., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 13:05:44 |
33 |
1931330045 | Isha Mufti Karuniagusti | 3 TKJJBA 2 | PERENCANAAN DIMENSI SALURAN DRAINASE PADA JALUR LINTAS SELATAN LOT 7 STA 0+000-STA 3+000 | KEAIRAN (TKJJBA) | Moh. Charits, ST., MMT | | TERDAFTAR | 2022-03-30 00:00:00 | 2022-03-31 17:55:52 |
34 |
1931330044 | Benedicta Aldora Putri | 3 TKJJBA 1 | Pengaruh Parkir On - Street Terhadap Kinerja Jalan Jendral Basuki Rahmat Kota Malang | TRANSPORTASI (TKJJBA) | Johanes Asdhi Poerwanto, ST., MMT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 13:24:11 |
35 |
1931330043 | AHMAD ALFIAN HABIBI | 3 TKJJBA 1 | Metode Pelaksanaan Dan Analisa Produktivitas Alat Berat Pada Underpass Jalan Desa STA 9+208 Jalan Tol Solo-Yogyakarta | MANAJEMEN KONSTRUKSI (TKJJBA) | Dr. Sumardi, ST., MT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-03-29 20:08:47 |
36 |
1931330042 | ELANG BAGUS FIRMANTORO | 3 TKJJBA 1 | METODE PELAKSANAAN DAN PERENCAAN ANGGARAN BIAYA PEKERJAAN SPILLWAY PROYEK PEMBANGUNAN BENDUNGAN BAGONG KABUPATEN TRENGGALEK | MANAJEMEN KONSTRUKSI (TKJJBA) | Dr. Sumardi, ST., MT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-03-29 20:08:45 |
37 |
1931330039 | FEREL FERDY JUAN PURNOMO | 3 TKJJBA 2 | Analisis Stabilitas Dinding Penahan Tanah Kantilever Segmen A-G Pada Proyek Jalur Lintas Selatan Lot 7 Blitar | GEOTEKNIK (TKJJBA) | Novita Anggraini, S.ST., MT | | TERDAFTAR | 2022-03-22 00:00:00 | 2022-03-26 07:47:40 |
38 |
1931330038 | ITSNA FARIDA YULIATI | 3 TKJJBA 2 | PERENCANAAN ULANG DRAINASE PEMUKIMAN DAERAH JALAN RADEN WIJAYA - JALAN BRIDJEN KATAMSO KABUPATEN PONOROGO | KEAIRAN (TKJJBA) | Medi Efendi, ST., MMT | | TERDAFTAR | 2022-03-15 00:00:00 | 2022-03-16 00:06:12 |
39 |
1931330037 | FIRDA GAMAR MARWANA | 3 TKJJBA 2 | PERENCANAAN ULANG DRAINASE PEMUKIMAN DI KAWASAN JALAN BARENG RAYA II KECAMATAN KLOJEN KOTA MALANG | KEAIRAN (TKJJBA) | Ikrar Hanggara, ST., MT | | TERDAFTAR | 2022-03-22 00:00:00 | 2022-03-22 14:03:56 |
40 |
1931330036 | Desinta Ramadini | 3 TKJJBA 2 | PERENCANAAN STRUKTUR TANDON AIR BESERTA ANALISA BIAYA PELAKSANAANNYA DI DESA PADANGSARI KAB. CIAMIS, TASIKMALAYA | STRUKTUR (TKJJBA) | Agus Sugiarto, ST., MM | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 13:03:00 |
41 |
1931330035 | ESTU PANGABEKTI FAHAMI | 3 TKJJBA 1 | PERHITUNGAN GEOMETRIK JALAN DAN PERENCANAAN DRAINASE PADA JALAN AKSES 2 PROYEK BENDUNGAN JLANTAH KABUPATEN KARANGANYAR
| TRANSPORTASI (TKJJBA) | Dwi Ratnaningsih, ST., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 13:12:20 |
42 |
1931330034 | ALDISAR YANUAR PUTRA | 3 TKJJBA 1 | PERENCANAAN STRUKTUR ATAS PADA JEMBATAN AKSES 2 PROYEK BENDUNGAN JLANTAH KABUPATEN KARANGANYAR | STRUKTUR (TKJJBA) | Dr. Akhmad Suryadi, BS., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 13:32:06 |
43 |
1931330033 | M. YOGI SOFYAN MUHTAROM | 3 TKJJBA 2 | PERENCANAAN ULANG DRAINASE PEMUKIMAN DAERAH JALAN TERUSAN SIGURA-GURA KECAMATAN SUKUN KOTA MALANG | KEAIRAN (TKJJBA) | Ratih Indri Hapsari, S.T., MT., Ph.D | | TERDAFTAR | 2022-03-15 00:00:00 | 2022-03-15 08:32:52 |
44 |
1931330032 | ERDITYA FENDY KURNIA ADITAMA | 3 TKJJBA 2 | PERENCANAAN JEMBATAN SOEKARNO HATTA - MALANG SISI UTARA MENJADI JEMBATAN RANGKA BAJA TIPE DECK TRUSS WARREN | STRUKTUR (TKJJBA) | Dr. Nawir Rasidi, ST., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 13:26:21 |
45 |
1931330031 | Zaimatul Ummah | 3 TKJJBA 1 | Perancanaan Ulang Drainase Jalan Pada Jakan Raya Sodo - Pelem Kecamtan Campurdarat Kabupaten Tulungagung | KEAIRAN (TKJJBA) | Medi Efendi, ST., MMT | | TERDAFTAR | 2022-03-18 00:00:00 | 2022-03-19 00:03:14 |
46 |
1931330030 | TRI UTAMI | 3 TKJJBA 2 | PERENCANAAN PERKERASAN KAKU PADA JALAN LINTAS SELATAN JARIT-PUGER (STA 43+250 SAMPAI DENGAN STA 47+250) | TRANSPORTASI (TKJJBA) | Nain Dhaniarti R., S.ST., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 12:56:57 |
47 |
1931330029 | ALESSANDRO MAULANA PUTRA YUDHA | 3 TKJJBA 2 | Perhitungan Ulang Geometrik Jalan Lintas Selatan Lot 7 Tambak Rejo-Serang Kabupaten Blitar STA 0+00 - STA 4+00 | TRANSPORTASI (TKJJBA) | Nain Dhaniarti R., S.ST., MT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-04-04 13:43:09 |
48 |
1931330028 | ERLANDO HARIS AKBAR | 3 TKJJBA 2 | PERENCANAAN PENJADWALAN DAN RAB PADA PROYEK PROGRAM HIBAH JALAN DAERAH DESA NGADAS KECAMATAN PONCOKUSUMO KABUPATEN MALANG | MANAJEMEN KONSTRUKSI (TKJJBA) | Dr. Diah Lydianingtias, ST., MM | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-04-03 17:38:48 |
49 |
1931330027 | SELLY HERAWATI | 3 TKJJBA 2 | Perhitungan Ulang Perkerasan Kaku Jalan Tol Solo-Yogyakarta-NYIA STA 1+000 - STA 2+975 | TRANSPORTASI (TKJJBA) | Marjono, ST., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 16:53:31 |
50 |
1931330025 | Muhammad Al - Amin | 3 TKJJBA 1 | Perencanaan Ulang Abutment Jembatan Pepe Proyek Pembangunan Jalan Tol Ruas Solo – Yogyakarta – Nyia Kulon Progo Paket 1.1 | GEOTEKNIK (TKJJBA) | Moch. Sholeh, ST., MT | | TERDAFTAR | 2022-03-22 00:00:00 | 2022-03-22 10:56:04 |
51 |
1931330024 | Nur Aini Zahro | 3 TKJJBA 2 | Analisis Perbandingan Biaya dan Struktur Perkerasan Lentur Dengan Dan Tanpa Menggunakan Lapis Pondasi Bawah (Studi Kasus : Development Of Trans South-South Java Road Poject (TRSS) Lot 8 Jarit - Puger) | MANAJEMEN KONSTRUKSI (TKJJBA) | Moch. Khamim, S.ST., MT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-04-03 17:27:08 |
52 |
1931330023 | DEO KOLIKIYA FEBRIARI | 3 TKJJBA 2 | PERENCANAAN ULANG DRAINASE PEMUKIMAN DAERAH JALAN KALPATARU-JALAN CENGGER AYAM KECAMATAN LOWOKWARU KOTA MALANG | KEAIRAN (TKJJBA) | Ayisya Cindy H. ST., MT | | TERDAFTAR | 2022-03-22 00:00:00 | 2022-03-22 14:46:07 |
53 |
1931330022 | SHERLY ADEFRID FEBY SUHARTO | 3 TKJJBA 2 | PERENCANAAN ULANG SALURAN DRAINASE PEMUKIMAN DAERAH JALAN KEDAWUNG, KECAMATAN LOWOKWARU, MALANG | KEAIRAN (TKJJBA) | Dr. Dra. Utami Retno Pudjowati, MSi | | TERDAFTAR | 2022-03-15 00:00:00 | 2022-03-15 21:36:59 |
54 |
1931330021 | MAY YOSSEVA PUTRI YANA | 3 TKJJBA 2 | METODE PENJADWALAN DAN RENCANA ANGGARAN BIAYA PADA PROYEK PEMBANGUNAN JEMBATAN BANJARPANJANG | MANAJEMEN KONSTRUKSI (TKJJBA) | Suselo Utoyo, ST., MMT | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 17:12:56 |
55 |
1931330020 | KIKI DEVI PUSPITASARI | 3 TKJJBA 1 | PERENCANAAN ULANG KAPASITAS SALURAN DRAINASE PERUMAHAN CITRA PESONA BURING PERMAI di KELURAHAN WONOKOYO KECAMATAN KEDUNG KADANG KOTA MALANG | KEAIRAN (TKJJBA) | Ratih Indri Hapsari, S.T., MT., Ph.D | | TERDAFTAR | 2022-03-15 00:00:00 | 2022-03-15 08:32:45 |
56 |
1931330019 | Nilasari Putri Wardiantomo | 3 TKJJBA 1 | Penjadwalan dan Rencana Anggaran Biaya Pembangunan Underpass Jalan Desa Sidomulyo STA 7+476 Jalan Tol Solo-Yogyakarta-NYIA Kulon Progo | MANAJEMEN KONSTRUKSI (TKJJBA) | Moch. Khamim, S.ST., MT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-03-29 19:49:43 |
57 |
1931330018 | MUHAMMAD NADIF RAFLIANSYAH P.A | 3 TKJJBA 2 | PERENCANAAN ULANG SALURAN DRAINASE PEMUKIMAN DAERAH JALAN IKAN MAS - JALAN IKAN MUJAIR KECAMATAN LOWOKWARU KOTA MALANG | KEAIRAN (TKJJBA) | Ikrar Hanggara, ST., MT | | TERDAFTAR | 2022-03-21 00:00:00 | 2022-03-21 18:04:11 |
58 |
1931330017 | Tasya Nur Haliza | 3 TKJJBA 1 | Metode Pelaksanaan dan Kapasitas Produksi Alat Berat Pondasi Bore Pile STA 8+689 Pada Proyek Pembangunan Jaln Tol Solo - Yogyakarta - NYIA Kulon Progo | MANAJEMEN KONSTRUKSI (TKJJBA) | Fadjar Purnomo, ST., MT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-03-29 20:03:47 |
59 |
1931330015 | ARAFI AKBAR WARDHANA PUTRA | 3 TKJJBA 1 | RENCANA ANGGARAN BIAYA, METODE PELAKSANAAN DAN PENJADWALAN PEKERJAAN TIMBUNANAN PROYEK JALAN TOL SOLO-YOGYAKARATA-NYIAKULONPROGO PAKET 1.1 STA 1+100 S/D 3+250 | MANAJEMEN KONSTRUKSI (TKJJBA) | Sitti Safiatus Riskijah, ST., MT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-03-29 20:10:03 |
60 |
1931330014 | SEPTANDHIY WIBISONO | 3 TKJJBA 1 | EVALUASI PARKIR ON STREET UNTUK MENGURANGI KEMACETAN AREA PASAR BLIMBING JL.BOROBUDUR, KOTA MALANG, JAWA TIMUR 65126 | TRANSPORTASI (TKJJBA) | Muhamad Fajar Subkhan, ST., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 13:11:20 |
61 |
1931330013 | Rochy Arrafi | 3 TKJJBA 1 | Perencanaan Penjadwalan dan Anggaran Biaya Underpass Jembatan Ngasem STA 0+616 Proyek Jalan Tol Solo - Yogyakarta - NYIA Kulonprogo | MANAJEMEN KONSTRUKSI (TKJJBA) | Suhariyanto, ST., MT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-03-29 19:55:44 |
62 |
1931330012 | M Bhilal Raihan N | 3 TKJJBA 2 | PERENCANAAN KOLAM RETENSI UNTUK MITIGASI BANJIR
GENANGAN PERUMAHAN BAPERTARUM DI DESA KOLOR,
KECAMATAN KOTA, KABUPATEN SUMENEP | KEAIRAN (TKJJBA) | Winda Harsanti, ST., MT | | TERDAFTAR | 2022-06-14 00:00:00 | 2022-06-21 15:59:08 |
63 |
1931330010 | SHERLAY TRI NOVITASARI | 3 TKJJBA 1 | OPTIMASI PENGGUNAAN ALAT BERAT PADA PEKERJAAN GALIAN TANAH FASILITAS UMUM PROYEK BENDUNGAN BAGONG KABUPATEN TRENGGALEK STA. 0+75 s/d 1+75 ELEVASI +345 s/d +335 | MANAJEMEN KONSTRUKSI (TKJJBA) | Dr. Diah Lydianingtias, ST., MM | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-03-29 19:48:09 |
64 |
1931330009 | FERDIAN STEVANI ARISANDI S. | 3 TKJJBA 1 | Pekerjaan Rehabilitasi Jaringan Irigasi Ampomangiran IV | KEAIRAN (TKJJBA) | Winda Harsanti, ST., MT | | TERDAFTAR | 2022-06-14 00:00:00 | 2022-06-14 09:16:15 |
65 |
1931330008 | IJLAL HIKAM SUPRIYANTO | 3 TKJJBA 1 | PERENCANAAN ULANG SALURAN DRAINASE PERUMAHAN BLURU PERMAI DI KABUPATEN SIDOARJO | KEAIRAN (TKJJBA) | Dr. Dra. Utami Retno Pudjowati, MSi | | TERDAFTAR | 2022-03-15 00:00:00 | 2022-03-15 09:18:06 |
66 |
1931330007 | HAFIDHATUL LAILIYAH | 3 TKJJBA 1 | Penerapan Keselamatan dan Kesehatan Kerja (K3) Pada Pembangunan Jalan Akses 1 Proyek Bendungan Jlantah Kabupaten Karanganyar | MANAJEMEN KONSTRUKSI (TKJJBA) | Joko Setiono, ST., MMT | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 12:01:51 |
67 |
1931330006 | Anri Heksa Ramadhan | 3 TKJJBA 2 | Perencanaan Pemanfaatan Air Limbah Industri PT Waskita Beton Precast Plant Klaten. | KEAIRAN (TKJJBA) | Moh. Zenurianto, Dipl.Ing.HTL., M.Sc | | TERDAFTAR | 2022-03-25 00:00:00 | 2022-03-27 16:03:02 |
68 |
1931330005 | KHOLIFAH NIRA SEFIYANTI | 3 TKJJBA 2 | PERHITUNGAN ULANG GEOMETRIK JALAN TOL RUAS SOLO-YOGYAKARTA-NYIA STA 11+600-STA 19+600 | TRANSPORTASI (TKJJBA) | Udi Subagyo, ST., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 12:59:57 |
69 |
1931330004 | RONI BAYU SETIAWAN | 3 TKJJBA 2 | EVALUASI KINERJA SIMPANG BERSINYAL JALAN KI AGENG GRIBIG - JALAN DANAU TOBA, SAWOJAJAR, KOTA MALANG | TRANSPORTASI (TKJJBA) | Dwi Ratnaningsih, ST., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 16:44:49 |
70 |
1931330003 | ACHMAD FADLI | 3 TKJJBA 2 | PERENCANAAN ULANG DRAINASE PEMUKIMAN DAERAH JALAN BENDUNGAN SENGGURUH - JALAN BENDUNGAN WONOGIRI, SUMBERSARI, KOTA MALANG | KEAIRAN (TKJJBA) | Agus Suhardono, ST., MT | | TERDAFTAR | 2022-03-18 00:00:00 | 2022-03-19 08:10:59 |
71 |
1931330002 | MAF'ULA SALSABILA RAMADHAN | 3 TKJJBA 1 | Analisis ruang parkir offstreet sepedah motor di area parkir mall olympic garden | TRANSPORTASI (TKJJBA) | Ir. Rinto Sasongko, MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 13:27:12 |
72 |
1931330001 | Dittha Metta Putri Ramadani | 3 TKJJBA 1 | Analisa Keamanan Kemiringan Lereng Inlet ( Bangunan Pengelak) Bendungan Bagong Paket 2 | GEOTEKNIK (TKJJBA) | Dandung Novianto, ST., MT | | TERDAFTAR | 2022-03-22 00:00:00 | 2022-03-22 11:00:02 |
73 |
1931310109 | GLADYS NATALIA ISWAN | 3 TS 4 | Penjadwalan dan Perencanaan Anggaran Biaya Proyek Jalur Lintas Selatan Lot. 6 STA. 7+000 – STA. 11+000 Segmen Prigi - Klathak MANAJEMEN KONSTRUKSI | MANAJEMEN KONSTRUKSI (TS) | Dr. Sumardi, ST., MT | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 13:39:39 |
74 |
1931310107 | ANNISA FALAH K.M | 3 TS 2 | ANALISIS PENGGUNAAN ALAT BERAT PADA PROYEK PEMBANGUNAN GEDUNG MALANG CREATIVE CENTER | MANAJEMEN KONSTRUKSI (TS) | Indah Ria R., ST., MT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-04-03 17:35:36 |
75 |
1931310106 | SYADAM ANDHIKA PUTRA | 3 TS 2 | PERENCANAAN STRUKTUR ATAS PADA PROYEK PEMBANGUNAN GEDUNG KULIAH TERPADU IAIN PONOROGO
| STRUKTUR (TS) | Wahiddin, ST., MT | | TERDAFTAR | 2022-07-26 00:00:00 | 2022-07-28 16:03:04 |
76 |
1931310105 | AMANDA ZEA PUTRI | 3 TS 4 | Metode Pelaksanaan Lapis Tambahan (Overlay) Perkerasan Lentur dan Anggaran Biaya pada Paket Pekerjaan Preservasi Jalan dan Jembatan Kertosono-Jombang-Mojokerto-Gempol Jawa Timur Ruas Mlirip-Krian (Mlirip-By pass Krian) | MANAJEMEN KONSTRUKSI (TS) | Suselo Utoyo, ST., MMT | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 12:28:51 |
77 |
1931310104 | Nawang Antonia Nariswari | 3 TS 1 | Penerapan Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) pada Pekerjaan Bore Pile Pembangunan Menara 17 PWNU JATIM | MANAJEMEN KONSTRUKSI (TS) | Dr. Sumardi, ST., MT | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 11:56:50 |
78 |
1931310102 | Mochamad Hadi Prasetyo | 3 TS 1 | PRODUKTIVITAS PENGGUNAAN ALAT BERAT PEKERJAAN BORE PILE PADA PEMBANGUNAN MENARA 17 PWNU JATIM | MANAJEMEN KONSTRUKSI (TS) | Moch. Khamim, S.ST., MT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-04-03 17:19:59 |
79 |
1931310101 | AGUNG TRI LAKSONO | 3 TS 1 | OPTIMALISASI PENGGUNAAN ALAT BERAT PADA PEMBANGUNAN DRAINASE V-DITCH PROYEK JALUR LINTAS SELATAN (JLS) LOT 7, DS. TAMBAKREJO,KEC. WONOTIRTO,KAB. BLITAR | MANAJEMEN KONSTRUKSI (TS) | Drs. Susapto, MT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-04-03 17:24:29 |
80 |
1931310100 | Shefa Kinhill Androw | 3 TS 1 | Metode Pelaksanaan Penjadwalan dan Rencana Anggaran Biaya Pembangunan Struktur Gedung Direktorat Poltek PU Kota Semarang | MANAJEMEN KONSTRUKSI (TS) | Joko Setiono, ST., MMT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-04-03 17:30:27 |
81 |
1931310099 | QORI AMIRA NISA | 3 TS 1 | Perencanaan Ulang Biaya dan Scheduling Pada Segmen 1 STA 2+500 – STA 5+500 Ruas Proyek JLS Lot 6: Prigi – Bts. Kabupaten Tulungagung – Klatak - Brumbun. | MANAJEMEN KONSTRUKSI (TS) | Moch. Khamim, S.ST., MT | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 11:44:06 |
82 |
1931310098 | RISKA ADELIA DEWI | 3 TS 3 | PERENCANAAN JADWAL DAN ANGGARAN BIAYA MENGGUNAKAN DINDING HEBEL DAN PLAT BETON PRECAST PADA PROYEK PEMBANGUNAN SHOWROOM DAN WORKSHOP DAIHATSU KOTA SURABAYA | MANAJEMEN KONSTRUKSI (TS) | Sitti Safiatus Riskijah, ST., MT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-08-08 16:22:14 |
83 |
1931310097 | Muhammad Hasan Farisqi | 3 TS 2 | Evaluasi Kinerja Simpang Bersinyal Simpang Jalan Panglima SUdirman - Jalan Dr Sutomo - Jalan Sahara Kecamatan Kraksaaan Kabupaten Probolinggo | TRANSPORTASI (TS) | Muhamad Fajar Subkhan, ST., MT | | TERDAFTAR | 2022-04-07 00:00:00 | 2022-04-07 12:34:41 |
84 |
1931310096 | SITI DIAH PUSPITA SARI | 3 TS 2 | PERENCANAAN JARINGAN PIPA DISTRIBUSI AIR BERSIH KECAMATAN PARENGAN KABUPATEN TUBAN PROVINSI JAWA TIMUR | KEAIRAN (TS) | Ikrar Hanggara, ST., MT | | TERDAFTAR | 2022-03-25 00:00:00 | 2022-03-28 11:12:35 |
85 |
1931310095 | GUNAWAN JANGKUNG WIBOWO | 3 TS 4 | Metode pelaksanaan dan Rencana Anggaran Biaya Konstruksi hellipad pada Guest House exindo57 | MANAJEMEN KONSTRUKSI (TS) | Suselo Utoyo, ST., MMT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-04-03 22:00:33 |
86 |
1931310094 | MUCHAMMAD ZAIN HELMI NOVANSYAH | 3 TS 2 | PENERAPAN KESEHATAN DAN KESELAMATAN KERJA (K3) DENGAN PENDEKATAN JOB SAFETY ANALYSIS (JSA) PADA PEKERJAAN TOE DRAIN | MANAJEMEN KONSTRUKSI (TS) | Radhia Jatu Noviarsita Sakti, ST., MT | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 12:06:15 |
87 |
1931310093 | FILZA ABITYA | 3 TS 3 | OPTIMASI BIAYA DAN WAKTU PENGGUNAAN ALAT BERAT PADA PEKERJAAN GALIAN DAN TIMBUNAN PROYEK LOT 3 - JEMBATAN KRETEK 2,KABUPATEN BANTUL | MANAJEMEN KONSTRUKSI (TS) | Indah Ria R., ST., MT | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 12:12:27 |
88 |
1931310092 | Akhmad Khairil | 3 TS 1 | Perencanaan Ulang Struktur Gedung Menara 17 PWNU Jawa Timur | STRUKTUR (TS) | Wahiddin, ST., MT | | TERDAFTAR | 2022-03-21 00:00:00 | 2022-03-22 14:39:16 |
89 |
1931310091 | Fikrie Maulanie Aziz | 3 TS 1 | Keamanan Scaffolding dalam pengecoran pier head p13 ramp 4 wringinanom toll KLBM | MANAJEMEN KONSTRUKSI (TS) | Joko Setiono, ST., MMT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-04-03 17:29:25 |
90 |
1931310090 | Raihan Harijanto | 3 TS 4 | PERHITUNGAN DAYA DUKUNG VERTIKAL PONDASI KELOMPOK TIANG BORED PILE PADA ABUTMENT JEMBATAN KRETEK 2 | GEOTEKNIK (TS) | Dandung Novianto, ST., MT | | TERDAFTAR | 2022-02-21 00:00:00 | 2022-02-21 18:25:52 |
91 |
1931310089 | Amelia Regita Putri | 3 TS 1 | Perencanaan Ulang Perkerasan Kaku Pada Proyek Jalan Tol Cimanggis – Cibitung Seksi 2 STA 39+000 – 42+400 | TRANSPORTASI (TS) | Dwi Ratnaningsih, ST., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-18 09:56:47 |
92 |
1931310088 | HAPPY RAY PANGESTU | 3 TS 2 | Penjadwalan Dan Perhitungan RABP Pada Proyek Pembangunan Gedung Malang Creative Center Kota Malang | MANAJEMEN KONSTRUKSI (TS) | Indah Ria R., ST., MT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-04-03 17:35:51 |
93 |
1931310086 | Nabil Mukti Talata | 3 TS 1 | Perencanaan Ulang Struktur Atas Proyek Gedung UKM Politeknik PUPR Semarang | STRUKTUR (TS) | Dr. Taufiq Rochman, ST., MT | | TERDAFTAR | 2022-04-01 00:00:00 | 2022-04-04 10:25:16 |
94 |
1931310084 | MUHAMMAD ASSEGAF | 3 TS 4 | ANALISA PERENCANAAN DAN WAKTU PEMASANGAN BAJA CASTELA PADA PROYEK PEMBANGUNAN SHOWROOM ISUZU DAN DAIHATSU SURABAYA | MANAJEMEN KONSTRUKSI (TS) | Sitti Safiatus Riskijah, ST., MT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-03-29 19:54:39 |
95 |
1931310081 | Jatmiko Cahyo Pambudi | 3 TS 4 | PENERAPAN SISTEM MANAJEMEN K3 PADA PROYEK JALAN NASIONAL PLANJAN-BARON-TEPUS | MANAJEMEN KONSTRUKSI (TS) | Joko Setiono, ST., MMT | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 12:11:16 |
96 |
1931310077 | Nurkhalifah Sugmadhevina | 3 TS 4 | Perencanaan Penjadwalan Pada Proyek Pembangunan Jalan Baru Planjan-Baron-Tepus Gunung Kidul, D.I. Yogyakarta | MANAJEMEN KONSTRUKSI (TS) | Suhariyanto, ST., MT | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 12:06:15 |
97 |
1931310076 | THEDY IRVANSYAH | 3 TS 3 | PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) PADA PROYEK LOT 3 JEMBATAN KRETEK 2 BANTUL | MANAJEMEN KONSTRUKSI (TS) | Joko Setiono, ST., MMT | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 13:34:50 |
98 |
1931310075 | JELITA ROSSA ISPRATIWI | 3 TS 3 | PERENCANAAN PERKERASAN LENTUR DAN RENCANA ANGGARAN BIAYA PADA PROYEK LINGKAR SELATAN KABUPATEN SAMPANG STA 3+900 - STA 6+897 | TRANSPORTASI (TS) | Marjono, ST., MT | | TERDAFTAR | 2022-02-21 00:00:00 | 2022-02-21 14:29:52 |
99 |
1931310074 | DIMAS SATRIA HERMANSYAH FIRDAUS | 3 TS 4 | PERENCANAAN SISTEM DRAINASE JALAN PROYEK JALUR LINTAS SELATAN (JLS) LOT 6 SEGMEN 1: KARANGGONGSO-NGLARAP-KLATAK, JAWA TIMUR
(STA 0+000 SAMPAI DENGAN STA 3+000) | KEAIRAN (TS) | Moh. Charits, ST., MMT | | TERDAFTAR | 2022-04-05 00:00:00 | 2022-04-05 10:47:33 |
100 |
1931310073 | Setya Andriana Leica | 3 TS 1 | Perencanaan Ulang Tebal Perkerasan Kaku dan Rencana Anggaran Biaya pada Proyek Pembangunan Jalan Tol Cimanggis – Cibitung Seksi 2 STA 42+400 – 45+800 | TRANSPORTASI (TS) | Dwi Ratnaningsih, ST., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-18 09:57:07 |