1 |
1931330049 | ABBY FATUR RAHMAN | 3 TKJJBA 1 | Perencanaan ulang Perkerasan Kaku dan Drainase Jalan Akses 1 pada Proyek Bendungan Jlantah di Kabupaten Karanganyar | TRANSPORTASI (TKJJBA) | Achendri M. Kurniawan, SPd., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 13:18:03 |
2 |
1931330036 | Desinta Ramadini | 3 TKJJBA 2 | PERENCANAAN STRUKTUR TANDON AIR BESERTA ANALISA BIAYA PELAKSANAANNYA DI DESA PADANGSARI KAB. CIAMIS, TASIKMALAYA | STRUKTUR (TKJJBA) | Agus Sugiarto, ST., MM | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 13:03:00 |
3 |
1931330003 | ACHMAD FADLI | 3 TKJJBA 2 | PERENCANAAN ULANG DRAINASE PEMUKIMAN DAERAH JALAN BENDUNGAN SENGGURUH - JALAN BENDUNGAN WONOGIRI, SUMBERSARI, KOTA MALANG | KEAIRAN (TKJJBA) | Agus Suhardono, ST., MT | | TERDAFTAR | 2022-03-18 00:00:00 | 2022-03-19 08:10:59 |
4 |
1931340025 | Prameswara Diva Syahputra | 3 TPB | Perancangan Geometri Jalan Angkut Batubar Akibat Kenaikan Air Sungai di PT KPP SPUT | KEAIRAN (TPB) | Agus Suhardono, ST., MT | | TERDAFTAR | 2022-03-14 00:00:00 | 2022-03-17 14:03:53 |
5 |
1931310016 | ALIF RIZKYAN AKRAMIN | 3 TS 2 | PERENCANAAN ULANG STRUKTUR ATAS BANGUNAN LABORATORIUM TERPADU UNIVERSITAS PGRI MADIUN | STRUKTUR (TS) | Agustin Dita Lestari, ST., MT | | TERDAFTAR | 2022-04-01 00:00:00 | 2022-04-14 13:14:12 |
6 |
1931310026 | Hudie Sadewa Aditya Rhamadan | 3 TS 1 | Perencanaan Ulang Proyek Pembangunan Asrama Harvard Thursina IIBS Kota Malang | STRUKTUR (TS) | Agustin Dita Lestari, ST., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-25 14:24:10 |
7 |
1931310010 | Desma Samosir | 3 TS 4 | PERENCANAAN SISTEM DRAINASE JALAN BARU PLANJAN-BARON-TEPUS,PROVINSI D.I YOGYAKARTA STA 5+100-STA 9+700 | KEAIRAN (TS) | Ayisya Cindy H. ST., MT | | TERDAFTAR | 2022-03-25 00:00:00 | 2022-03-25 11:01:55 |
8 |
1931310030 | AHMAD KHAN AMRULLOH | 3 TS 4 | Perencanaan Saluran Drainase Jalan Baru Planjan-Baron-Tepus, Provinsi D.I. Yogyakarta STA 0+000 Sampai STA 5+000 | KEAIRAN (TS) | Ayisya Cindy H. ST., MT | | TERDAFTAR | 2022-03-23 00:00:00 | 2022-03-23 13:53:08 |
9 |
1931330023 | DEO KOLIKIYA FEBRIARI | 3 TKJJBA 2 | PERENCANAAN ULANG DRAINASE PEMUKIMAN DAERAH JALAN KALPATARU-JALAN CENGGER AYAM KECAMATAN LOWOKWARU KOTA MALANG | KEAIRAN (TKJJBA) | Ayisya Cindy H. ST., MT | | TERDAFTAR | 2022-03-22 00:00:00 | 2022-03-22 14:46:07 |
10 |
1931330047 | IHDA ZAHROTIN NISA' | 3 TKJJBA 1 | Perencanaan Ulang Tanggul Sungai Bogowonto (KSN) YIA | KEAIRAN (TKJJBA) | Ayisya Cindy H. ST., MT | | TERDAFTAR | 2022-03-15 00:00:00 | 2022-03-15 08:40:24 |
11 |
1931310053 | MOH. AINUL YAQIN | 3 TS 3 | PERENCANAAN STRUKTUR GEDUNG RUMAH SAKIT UBAYA DI JL. PANJANG JIWO, RUNGKUT, SURABAYA TAHAP 1 | STRUKTUR (TS) | Bobby Asukmajaya R., S.ST., MT | | TERDAFTAR | 2022-03-14 00:00:00 | 2022-03-14 18:15:59 |
12 |
1931310067 | MJ. BONANG AL-MUJAHID | 3 TS 4 | PERENCANAAN STRUKTUR ATAS GEDUNG UKM UNIVERSITAS NEGERI MALANG | STRUKTUR (TS) | Bobby Asukmajaya R., S.ST., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 14:03:07 |
13 |
1931310068 | KHOIRUN NI'MAH | 3 TS 4 | Perencanaan Struktur Atas Jembatan STA 14+900 Jalur Lintas Selatan Lot 6 Kab. Tulungagung | STRUKTUR (TS) | Bobby Asukmajaya R., S.ST., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 13:27:59 |
14 |
1931310024 | MAULANA DWI TIRTA | 3 TS 3 | PERENCANAAN ULANG FONDASI TIANG PANCANG SHOWROOM DAN WORKSHOP DAIHATSU JALAN IR SOEKARNO (MERR) KOTA SURABAYA | GEOTEKNIK (TS) | Dandung Novianto, ST., MT | | TERDAFTAR | 2022-03-22 00:00:00 | 2022-03-22 11:03:59 |
15 |
1931310041 | Rosalia Isna Putri | 3 TS 3 | Perencanaan Ulang Pondasi Bore Pile Apartemen Westown View Tower La Chiva Kota Surabaya | GEOTEKNIK (TS) | Dandung Novianto, ST., MT | | TERDAFTAR | 2022-02-21 00:00:00 | 2022-02-21 14:53:24 |
16 |
1931310045 | ADRIAN WAHYU PURNOMO | 3 TS 3 | PERENCANAAN ULANG PONDASI TIANG PANCANG SHOWROOM ISUZU JALAN IR SOEKARNO KOTA SURABAYA
| GEOTEKNIK (TS) | Dandung Novianto, ST., MT | | TERDAFTAR | 2022-02-21 00:00:00 | 2022-02-22 13:56:02 |
17 |
1931310090 | Raihan Harijanto | 3 TS 4 | PERHITUNGAN DAYA DUKUNG VERTIKAL PONDASI KELOMPOK TIANG BORED PILE PADA ABUTMENT JEMBATAN KRETEK 2 | GEOTEKNIK (TS) | Dandung Novianto, ST., MT | | TERDAFTAR | 2022-02-21 00:00:00 | 2022-02-21 18:25:52 |
18 |
1931330001 | Dittha Metta Putri Ramadani | 3 TKJJBA 1 | Analisa Keamanan Kemiringan Lereng Inlet ( Bangunan Pengelak) Bendungan Bagong Paket 2 | GEOTEKNIK (TKJJBA) | Dandung Novianto, ST., MT | | TERDAFTAR | 2022-03-22 00:00:00 | 2022-03-22 11:00:02 |
19 |
1931340003 | Ryan Dwi Prasongko | 3 TPB | IMPLEMENTASI BOTTOM GASBAG DAN EXPAND PATTERN DALAM RANGKA OPTIMALISASI PENGGUNAAN BAHAN PELEDAK YANG BERDEKATAN DENGAN PEMUKIMAN DI PIT AGHATIS PT. KALIMANTAN PRIMA PERSADA JOBSITE RANTAU KABUPATEN TAPIN KALIMANTAN SELATAN | PRODI PERTAMBANGAN | Diana Irmawati Pradani, ST., MT | | TERDAFTAR | 2022-03-03 00:00:00 | 2022-03-03 21:34:58 |
20 |
1931340015 | Damar Rakha Dhana | 3 TPB | Pengaruh Geometri Peledakan Terhadap Fragmentasi Batuan PT. Gunung Padakasih | PRODI PERTAMBANGAN | Diana Irmawati Pradani, ST., MT | | TERDAFTAR | 2022-03-14 00:00:00 | 2022-03-15 17:48:48 |
21 |
1931340018 | Artha Tsania Kamilati | 3 TPB | OPTIMASI KAPASITAS DISPOSAL TIMUR PIT ALE DENGAN ANALISIS PENGARUH FAKTOR GETARAN PELEDAKAN DI PT. KALIMANTAN PRIMA PERSADA SITE ASAM ASAM | PRODI PERTAMBANGAN | Diana Irmawati Pradani, ST., MT | | TERDAFTAR | 2022-03-14 00:00:00 | 2022-03-17 08:34:41 |
22 |
1931340020 | Prima Aryandi | 3 TPB |
OBSERVASI HASIL FRAGMENTASI PADA KEGIATAN PELEDAKAN DI PT. LOTUS SG LESTARI | PRODI PERTAMBANGAN | Diana Irmawati Pradani, ST., MT | | TERDAFTAR | 2022-03-03 00:00:00 | 2022-03-03 21:41:30 |
23 |
1931340024 | Iqbal Arvy Ardiansyah | 3 TPB | Efektivitas Crushing Plant Batu Andesit terhadap Target Produksi di PT Gunung Padakasih, Site Cangkorah, Kabupaten Bandung Barat, Jawa Barat | PRODI PERTAMBANGAN | Diana Irmawati Pradani, ST., MT | | TERDAFTAR | 2022-03-03 00:00:00 | 2022-03-03 21:28:17 |
24 |
1931310060 | MUCHAMMAD KHAFID SYAFRIL WALIYYUDDIN | 3 TS 1 | Perencanaan Ulang Struktur Atas pada Pembangunan Gedung Direktorat Politeknik PUPR Semarang | STRUKTUR (TS) | Dr. Akhmad Suryadi, BS., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-18 10:26:48 |
25 |
1931330034 | ALDISAR YANUAR PUTRA | 3 TKJJBA 1 | PERENCANAAN STRUKTUR ATAS PADA JEMBATAN AKSES 2 PROYEK BENDUNGAN JLANTAH KABUPATEN KARANGANYAR | STRUKTUR (TKJJBA) | Dr. Akhmad Suryadi, BS., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 13:32:06 |
26 |
1931310007 | AHMAD HABIB ALHUDA | 3 TS 3 | Pengendalian Waktu dan Biaya pada Proyek Pembangunan Showroom dan Workshop Daihatsu PT. Archikon Wiratama | MANAJEMEN KONSTRUKSI (TS) | Dr. Diah Lydianingtias, ST., MM | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 11:37:05 |
27 |
1931310047 | MIFTAKHUL JANNAH | 3 TS 3 | METODE PELAKSANAAN DAN RENCANA ANGGARAN BIAYA PROYEK PEMBANGUNAN GEDUNG RUMAH SAKIT UBAYA (TAHAP I) | MANAJEMEN KONSTRUKSI (TS) | Dr. Diah Lydianingtias, ST., MM | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 11:45:30 |
28 |
1931330010 | SHERLAY TRI NOVITASARI | 3 TKJJBA 1 | OPTIMASI PENGGUNAAN ALAT BERAT PADA PEKERJAAN GALIAN TANAH FASILITAS UMUM PROYEK BENDUNGAN BAGONG KABUPATEN TRENGGALEK STA. 0+75 s/d 1+75 ELEVASI +345 s/d +335 | MANAJEMEN KONSTRUKSI (TKJJBA) | Dr. Diah Lydianingtias, ST., MM | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-03-29 19:48:09 |
29 |
1931330028 | ERLANDO HARIS AKBAR | 3 TKJJBA 2 | PERENCANAAN PENJADWALAN DAN RAB PADA PROYEK PROGRAM HIBAH JALAN DAERAH DESA NGADAS KECAMATAN PONCOKUSUMO KABUPATEN MALANG | MANAJEMEN KONSTRUKSI (TKJJBA) | Dr. Diah Lydianingtias, ST., MM | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-04-03 17:38:48 |
30 |
1931340004 | Alya Fariidah | 3 TPB | Produktivitas Alat Muat dan Alat Angkut di PT. Bina Insanni Selaras guna Mencapai Target Produksi Harian Pasir Batu | MANAJEMEN KONSTRUKSI (TPB) | Dr. Diah Lydianingtias, ST., MM | | TERDAFTAR | 2022-03-03 00:00:00 | 2022-03-04 08:38:18 |
31 |
1931340010 | ICHA ROQIQOH DZAKIYYAH | 3 TPB | Analisis Produktivtas Alat Gali Muat (Excavator Kobelco SK200) dan Alat Angkut (Dump Truck Mitsubishi Colt Fuso Diesel 136PS) di CV. Putra Mandiri | MANAJEMEN KONSTRUKSI (TPB) | Dr. Diah Lydianingtias, ST., MM | | TERDAFTAR | 2022-03-04 00:00:00 | 2022-03-04 08:27:52 |
32 |
1931330008 | IJLAL HIKAM SUPRIYANTO | 3 TKJJBA 1 | PERENCANAAN ULANG SALURAN DRAINASE PERUMAHAN BLURU PERMAI DI KABUPATEN SIDOARJO | KEAIRAN (TKJJBA) | Dr. Dra. Utami Retno Pudjowati, MSi | | TERDAFTAR | 2022-03-15 00:00:00 | 2022-03-15 09:18:06 |
33 |
1931330022 | SHERLY ADEFRID FEBY SUHARTO | 3 TKJJBA 2 | PERENCANAAN ULANG SALURAN DRAINASE PEMUKIMAN DAERAH JALAN KEDAWUNG, KECAMATAN LOWOKWARU, MALANG | KEAIRAN (TKJJBA) | Dr. Dra. Utami Retno Pudjowati, MSi | | TERDAFTAR | 2022-03-15 00:00:00 | 2022-03-15 21:36:59 |
34 |
1931340016 | Miftahul Jannah | 3 TPB | Perencanaan Sistem Penyaliran Tambang Pasir di CV. Putra Mandiri | KEAIRAN (TPB) | Dr. Dra. Utami Retno Pudjowati, MSi | | TERDAFTAR | 2022-03-14 00:00:00 | 2022-03-16 23:53:51 |
35 |
1931340019 | Uzdah Rachmi Gunawan | 3 TPB | Perencanaan Ulang Saluran Drainase Tambang PT. Bina Insanni Selaras, Kabupaten Bandung, Jawa Barat | KEAIRAN (TPB) | Dr. Dra. Utami Retno Pudjowati, MSi | | TERDAFTAR | 2022-03-25 00:00:00 | 2022-03-25 07:28:29 |
36 |
1931310014 | Luthfiyana Setia Rahman | 3 TS 1 | PERENCANAAN ULANG PERKERASAN LENTUR DAN RENCANA ANGGARAN BIAYA PADA PROYEK JALAN LINTAS SELATAN LOT 7 BLITAR STA 0+100 - STA 3+350 | TRANSPORTASI (TS) | Dr. Drs. Burhamtoro, ST., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 13:25:51 |
37 |
1931310051 | Happy Mareta | 3 TS 1 | Perencanaan Ulang Tebal Perkerasan Kaku (Rigid Pavement) dan Anggaran Biaya pada Proyek Jalan Tol Cimanggis – Cibitung STA 35+700 – STA 39+000 | TRANSPORTASI (TS) | Dr. Drs. Burhamtoro, ST., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 13:23:43 |
38 |
1931310057 | ANISA GITA OKTAVIA | 3 TS 1 | PERENCANAAN ULANG PERKERASAN LENTUR DAN RENCANA ANGGARAN BIAYA PADA PROYEK JALAN LINTAS SELATAN LOT 7: BTS. KAB. TULUNGAGUNG – SERANG – BTS. KAB. MALANG (STA 3+500 – STA 6+750) | TRANSPORTASI (TS) | Dr. Drs. Burhamtoro, ST., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 13:26:18 |
39 |
1931330053 | ANDIKA RESA SAIFULO | 3 TKJJBA 1 | Evaluasi Kinerja Simpang Bersinyal Jalan Brigjend Slamet Riyadi - Jalan Nasional
III Kecamatan Lumajang, Kabupaten Lumajang | TRANSPORTASI (TKJJBA) | Dr. Drs. Burhamtoro, ST., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 13:26:20 |
40 |
1931330032 | ERDITYA FENDY KURNIA ADITAMA | 3 TKJJBA 2 | PERENCANAAN JEMBATAN SOEKARNO HATTA - MALANG SISI UTARA MENJADI JEMBATAN RANGKA BAJA TIPE DECK TRUSS WARREN | STRUKTUR (TKJJBA) | Dr. Nawir Rasidi, ST., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 13:26:21 |
41 |
1831310140 | JOHN STEVEN SAMUEL SIBARANI | 3 TS 4 | Efisiensi Alat Berat Pada Pembangunan Jalan Baru Planjan-Baron-Tepus, D.I. Yogyakarta | MANAJEMEN KONSTRUKSI (TS) | Dr. Sumardi, ST., MT | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 15:46:52 |
42 |
1931310104 | Nawang Antonia Nariswari | 3 TS 1 | Penerapan Sistem Manajemen Keselamatan dan Kesehatan Kerja (SMK3) pada Pekerjaan Bore Pile Pembangunan Menara 17 PWNU JATIM | MANAJEMEN KONSTRUKSI (TS) | Dr. Sumardi, ST., MT | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 11:56:50 |
43 |
1931310109 | GLADYS NATALIA ISWAN | 3 TS 4 | Penjadwalan dan Perencanaan Anggaran Biaya Proyek Jalur Lintas Selatan Lot. 6 STA. 7+000 – STA. 11+000 Segmen Prigi - Klathak MANAJEMEN KONSTRUKSI | MANAJEMEN KONSTRUKSI (TS) | Dr. Sumardi, ST., MT | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 13:39:39 |
44 |
1931330042 | ELANG BAGUS FIRMANTORO | 3 TKJJBA 1 | METODE PELAKSANAAN DAN PERENCAAN ANGGARAN BIAYA PEKERJAAN SPILLWAY PROYEK PEMBANGUNAN BENDUNGAN BAGONG KABUPATEN TRENGGALEK | MANAJEMEN KONSTRUKSI (TKJJBA) | Dr. Sumardi, ST., MT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-03-29 20:08:45 |
45 |
1931330043 | AHMAD ALFIAN HABIBI | 3 TKJJBA 1 | Metode Pelaksanaan Dan Analisa Produktivitas Alat Berat Pada Underpass Jalan Desa STA 9+208 Jalan Tol Solo-Yogyakarta | MANAJEMEN KONSTRUKSI (TKJJBA) | Dr. Sumardi, ST., MT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-03-29 20:08:47 |
46 |
1931310028 | ERIKA AGUNG PRASETYO | 3 TS 1 | PERENCANAAN STRUKTUR ATAS PADA PROYEK PEMBANGUNAN GEDUNG AUDITORIUM UNIVERSITAS BRAWIJAYA MALANG | STRUKTUR (TS) | Dr. Taufiq Rochman, ST., MT | | TERDAFTAR | 2022-04-01 00:00:00 | 2022-05-23 09:04:39 |
47 |
1931310050 | Ilma Maulana Fathurrozi | 3 TS 2 | PERENCANAAN ULANG STRUKTUR ATAS DAN ANGGARAN BIAYA STRUKTUR BANGUNAN GEDUNG APARTEMENT CAPITAL SQUARE SURABAYA | STRUKTUR (TS) | Dr. Taufiq Rochman, ST., MT | | TERDAFTAR | 2022-04-04 00:00:00 | 2022-04-18 04:11:46 |
48 |
1931310086 | Nabil Mukti Talata | 3 TS 1 | Perencanaan Ulang Struktur Atas Proyek Gedung UKM Politeknik PUPR Semarang | STRUKTUR (TS) | Dr. Taufiq Rochman, ST., MT | | TERDAFTAR | 2022-04-01 00:00:00 | 2022-04-04 10:25:16 |
49 |
1931310032 | CERNIO MAJIID | 3 TS 2 | PERENCANAAN ULANG STRUKTUR ATAS BANGUNAN OFFICE PADA PROYEK CAPITAL SQUARE SURABAYA | STRUKTUR (TS) | Drs. Armin Naibaho, ST., MT | | TERDAFTAR | 2022-03-21 00:00:00 | 2022-04-13 21:39:51 |
50 |
1931310059 | DOITI IMATHULADA | 3 TS 4 | Perencanaan Ulang Struktur Atas dan Anggaran Biaya Bangunan Gedung Guest House Exindo 57, Kauman, Kabupaten Nganjuk, Jawa Timur | STRUKTUR (TS) | Drs. Armin Naibaho, ST., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 13:20:04 |
51 |
1931310023 | Silvy Nur Kholifah | 3 TS 1 | Metode Pelaksanaan dan Rencana Anggaran Biaya pada Proyek Pembangunan Menara 17 PWNU Jatim | MANAJEMEN KONSTRUKSI (TS) | Drs. Susapto, MT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-03-29 19:26:04 |
52 |
1931310035 | Nailur Rofiah | 3 TS 3 | ANALISA OPTIMALISASI PENJADWALAN DAN BIAYA PADA STRUKTUR ATAS PROYEK JEMBATAN CROSSING ANTELOPE BEKASI DK 5+145, KERETA CEPAT INDONESIA CHINA MENGGUNAKAN METODE DURATION COST TRADE OFF | MANAJEMEN KONSTRUKSI (TS) | Drs. Susapto, MT | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 15:00:45 |
53 |
1931310049 | Moch.Akbar Ikhwanul Haris | 3 TS 3 | PERENCANAAN JADWAL DAN ANGGARAN BIAYA STRUKTUR BAWAH PROYEK JEMBATAN CROSSING ANTELOPE BEKASI DK 5+145 KERETA CEPAT INDONESIA CHINA | MANAJEMEN KONSTRUKSI (TS) | Drs. Susapto, MT | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 18:01:53 |
54 |
1931310101 | AGUNG TRI LAKSONO | 3 TS 1 | OPTIMALISASI PENGGUNAAN ALAT BERAT PADA PEMBANGUNAN DRAINASE V-DITCH PROYEK JALUR LINTAS SELATAN (JLS) LOT 7, DS. TAMBAKREJO,KEC. WONOTIRTO,KAB. BLITAR | MANAJEMEN KONSTRUKSI (TS) | Drs. Susapto, MT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-04-03 17:24:29 |
55 |
1931330048 | Refi Rahmatika Sari | 3 TKJJBA 1 | Metode Pelaksanaan Dan Penjadwalan Underpass Jalan Desa Sta 9+600 pada Tol Solo - Yogyakarta - NYIA Kulonprogo | MANAJEMEN KONSTRUKSI (TKJJBA) | Drs. Susapto, MT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-03-29 20:12:22 |
56 |
1931310073 | Setya Andriana Leica | 3 TS 1 | Perencanaan Ulang Tebal Perkerasan Kaku dan Rencana Anggaran Biaya pada Proyek Pembangunan Jalan Tol Cimanggis – Cibitung Seksi 2 STA 42+400 – 45+800 | TRANSPORTASI (TS) | Dwi Ratnaningsih, ST., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-18 09:57:07 |
57 |
1931310089 | Amelia Regita Putri | 3 TS 1 | Perencanaan Ulang Perkerasan Kaku Pada Proyek Jalan Tol Cimanggis – Cibitung Seksi 2 STA 39+000 – 42+400 | TRANSPORTASI (TS) | Dwi Ratnaningsih, ST., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-18 09:56:47 |
58 |
1931330004 | RONI BAYU SETIAWAN | 3 TKJJBA 2 | EVALUASI KINERJA SIMPANG BERSINYAL JALAN KI AGENG GRIBIG - JALAN DANAU TOBA, SAWOJAJAR, KOTA MALANG | TRANSPORTASI (TKJJBA) | Dwi Ratnaningsih, ST., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 16:44:49 |
59 |
1931330035 | ESTU PANGABEKTI FAHAMI | 3 TKJJBA 1 | PERHITUNGAN GEOMETRIK JALAN DAN PERENCANAAN DRAINASE PADA JALAN AKSES 2 PROYEK BENDUNGAN JLANTAH KABUPATEN KARANGANYAR
| TRANSPORTASI (TKJJBA) | Dwi Ratnaningsih, ST., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 13:12:20 |
60 |
1931310038 | Alif Dwiandra Alfadil | 3 TS 3 | TINJAUAN PERBANDINGAN PEKERJAAN DENGAN PENGGUNAAN BEKISTING BAJA DAN BEKISTING KAYU PADA PROYEK JEMBATAN CROSSING ANTELOPE DK5+145 | MANAJEMEN KONSTRUKSI (TS) | Fadjar Purnomo, ST., MT | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 14:29:47 |
61 |
1931310043 | Akmal Salim Basharahil | 3 TS 1 | Studi Penjadwalan Waktu dan Anggaran Biaya (RAB) pada Proyek Pembangunan Perumahan Griya Kasin | MANAJEMEN KONSTRUKSI (TS) | Fadjar Purnomo, ST., MT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-04-03 17:30:28 |
62 |
1931310055 | NUR ADILAH LUTHFIYAH | 3 TS 3 | PENJADWALAN DAN PERENCANAAN RAB PEKERJAAN GALIAN DAN TIMBUNAN PROYEK JALAN DAN JEMBATAN LINGKAR SELATAN SAMPANG | MANAJEMEN KONSTRUKSI (TS) | Fadjar Purnomo, ST., MT | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 12:22:30 |
63 |
1931310070 | Muhammad Ilham Febriansyah | 3 TS 3 | Perencanaan Jadwal dan Anggaran Biaya Pada Proyek Pembangunan Poliklinik Terpadu Rumah Sakit Wijaya Kusuma Kabupaten Lumajang | MANAJEMEN KONSTRUKSI (TS) | Fadjar Purnomo, ST., MT | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 12:22:52 |
64 |
1931330017 | Tasya Nur Haliza | 3 TKJJBA 1 | Metode Pelaksanaan dan Kapasitas Produksi Alat Berat Pondasi Bore Pile STA 8+689 Pada Proyek Pembangunan Jaln Tol Solo - Yogyakarta - NYIA Kulon Progo | MANAJEMEN KONSTRUKSI (TKJJBA) | Fadjar Purnomo, ST., MT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-03-29 20:03:47 |
65 |
1931340006 | AUFA RAZZQIA MASYA FORTUNITA | 3 TPB | EFISIENSI EXCAVATOR PC200-8 DAN CATERPILLAR 320 PADA PENAMBANGAN TANAH URUG DI PT MUDA MUDI INDONESIA | PRODI PERTAMBANGAN | Gindang Rain Pratama, ST., MT | | TERDAFTAR | 2022-02-24 00:00:00 | 2022-02-24 20:01:18 |
66 |
1931340007 | BUNGA PUTRI MILENIA | 3 TPB | Perhitungan Nilai Matching Factor Unit Wheel Loader dengan Barge Loader di PT. Kalimantan Prima Persada Jobsite Sungai Puting
| PRODI PERTAMBANGAN | Gindang Rain Pratama, ST., MT | | TERDAFTAR | 2022-02-24 00:00:00 | 2022-02-24 20:10:08 |
67 |
1931340009 | Rahadewi Netta Maghfiroh | 3 TPB | Pperencanaan dan Optimasi Dewatering Sump Pit ALE Tahun 2022 PT Kalimantan Prima Persada Site Asam-Asam Kalimantan Selatan | PRODI PERTAMBANGAN | Gindang Rain Pratama, ST., MT | | TERDAFTAR | 2022-02-24 00:00:00 | 2022-02-24 19:58:32 |
68 |
1931340027 | WAFIKRON FALAQISSOBA | 3 TPB | Evaluasi Keserasian (Match Faktor) alat gali muat di PT Lotus SG Lestari | PRODI PERTAMBANGAN | Gindang Rain Pratama, ST., MT | | TERDAFTAR | 2022-03-03 00:00:00 | 2022-03-03 21:26:34 |
69 |
1931340028 | ilham fanandi saputra | 3 TPB | Evaluasi Kinerja Alat Bor Crawler Rock Drill (CRD) Dalam Pembuatan Lubang ledak PT Lotus SG Lestari | PRODI PERTAMBANGAN | Gindang Rain Pratama, ST., MT | | TERDAFTAR | 2022-03-03 00:00:00 | 2022-03-03 21:24:11 |
70 |
1931340013 | DAMAR RAKHA DHANI | 3 TPB | ESTIMASI SUMBERDAYA PASIR BATU DENGAN METODE CROSS SECTION DAN METODE CONTOUR DI DESA SUPITURANG, KECAMATAN PRONOJIWO, KABUPATAN LUMAJANG, JAWA TIMUR | PRODI PERTAMBANGAN | Gregorius Aryoko G., S.KOM., MT | | TERDAFTAR | 2022-03-14 00:00:00 | 2022-03-15 09:22:58 |
71 |
1931340022 | Mohammad Figo Wicaksana Adi | 3 TPB | Evaluasi Perhitungan Tanah Penutup dan Biaya Jaminan Reklamasi pada PT Muda Mudi Indonesia Kecamatan Jetis Kabupaten Mojokerto Jawa Timur | PRODI PERTAMBANGAN | Gregorius Aryoko G., S.KOM., MT | | TERDAFTAR | 2022-04-20 00:00:00 | 2022-04-24 16:37:14 |
72 |
1931340008 | Diyan Bagaskara | 3 TPB | ANALISIS KEGIATAN PRODUKSI ALAT GALI MUAT DAN ALAT ANGKUT PADA PERTAMBANGAN BATUANDESIT DI PT. GUNUNG PADAKASIH | PRODI PERTAMBANGAN | Harsalim Aimunandar J., ST., MT | | TERDAFTAR | 2022-03-03 00:00:00 | 2022-03-03 21:37:31 |
73 |
1931340012 | Muhammad Romi Amarullah | 3 TPB | Estimasi Sumberdaya Terukur Tanah Urug Menggunakan Metode Penampang dan Metode Kontur Pada PT. Cahaya Afif Sejahtera Purworejo | PRODI PERTAMBANGAN | Harsalim Aimunandar J., ST., MT | | TERDAFTAR | 2022-03-03 00:00:00 | 2022-03-03 21:37:37 |
74 |
1931340014 | Muhammad Ghazy Apung Estyawan | 3 TPB | PENERAPAN METODE SAYATAN DAN CONTUR PERHITUNGAN ESTIMASI SUMBERDAYA TANAH URUG PT. CAHAYA AFIF SEJAHTERA SITE REBUG KABUPATEN PURWOREJO PROVINSI JAWA TENGAH | PRODI PERTAMBANGAN | Harsalim Aimunandar J., ST., MT | | TERDAFTAR | 2022-03-14 00:00:00 | 2022-03-14 08:59:33 |
75 |
1931340017 | MUHAMMAD ANUGRAH SIDIK PURNOMO | 3 TPB | PERENCANAAN KEBUTUHAN POMPA PADA TAMBANG BATUBARA DI PIT AGATHIS JOBSITE RANTAU PT KALIMANTAN PRIMA PERSADA | PRODI PERTAMBANGAN | Harsalim Aimunandar J., ST., MT | | TERDAFTAR | 2022-03-14 00:00:00 | 2022-03-16 11:58:12 |
76 |
1931340023 | Muhammad Dzulfiqar Sya'roni | 3 TPB | PERHITUNGAN SUMBERDAYA PASIR DENGAN BLOK MODEL DENGAN ESTIMASI INVERSE DISTANCE WEIGHTING PADA BLOK X DESA SUPITURANG KABUPATEN LUMAJANG | PRODI PERTAMBANGAN | Harsalim Aimunandar J., ST., MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-18 11:48:49 |
77 |
1931340001 | Aulia Wahyu Fitrannur | 3 TPB | Perbandingan Estimasi Sumberdaya dan Cadangan Metode Cross Section dengan Metode Contour di Lembah Kera, Desa Pagak, Kecamatan Pagak, Kabupaten Malang | PRODI PERTAMBANGAN | Helik Susilo, ST., M.Eng | | TERDAFTAR | 2022-03-03 00:00:00 | 2022-03-07 14:54:23 |
78 |
1931340011 | Raja Haibah Shidqu | 3 TPB | Pemetaan Potensi Bahan Galian Tanah Urug Menggunakan Sistem Informasi Geografis Pada IUP Eksplorasi PT.Cahaya Afif Sejahtera Purworejo | PRODI PERTAMBANGAN | Helik Susilo, ST., M.Eng | | TERDAFTAR | 2022-03-03 00:00:00 | 2022-03-04 10:50:19 |
79 |
1931310096 | SITI DIAH PUSPITA SARI | 3 TS 2 | PERENCANAAN JARINGAN PIPA DISTRIBUSI AIR BERSIH KECAMATAN PARENGAN KABUPATEN TUBAN PROVINSI JAWA TIMUR | KEAIRAN (TS) | Ikrar Hanggara, ST., MT | | TERDAFTAR | 2022-03-25 00:00:00 | 2022-03-28 11:12:35 |
80 |
1931330018 | MUHAMMAD NADIF RAFLIANSYAH P.A | 3 TKJJBA 2 | PERENCANAAN ULANG SALURAN DRAINASE PEMUKIMAN DAERAH JALAN IKAN MAS - JALAN IKAN MUJAIR KECAMATAN LOWOKWARU KOTA MALANG | KEAIRAN (TKJJBA) | Ikrar Hanggara, ST., MT | | TERDAFTAR | 2022-03-21 00:00:00 | 2022-03-21 18:04:11 |
81 |
1931330037 | FIRDA GAMAR MARWANA | 3 TKJJBA 2 | PERENCANAAN ULANG DRAINASE PEMUKIMAN DI KAWASAN JALAN BARENG RAYA II KECAMATAN KLOJEN KOTA MALANG | KEAIRAN (TKJJBA) | Ikrar Hanggara, ST., MT | | TERDAFTAR | 2022-03-22 00:00:00 | 2022-03-22 14:03:56 |
82 |
1931310017 | FRENGKI | 3 TS 2 | PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) PADA PROYEK PEMBANGUNAN GEDUNG MCC KOTA MALANG | MANAJEMEN KONSTRUKSI (TS) | Indah Ria R., ST., MT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-04-03 18:26:35 |
83 |
1931310027 | Rahma Dani | 3 TS 4 | Penjadwalan dan estimasi biaya proyek Jalur Lintas Selatan Lot 6 segmen 2 besole - brumbun STA 0+000 - STA 3+275 | MANAJEMEN KONSTRUKSI (TS) | Indah Ria R., ST., MT | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 12:19:35 |
84 |
1931310088 | HAPPY RAY PANGESTU | 3 TS 2 | Penjadwalan Dan Perhitungan RABP Pada Proyek Pembangunan Gedung Malang Creative Center Kota Malang | MANAJEMEN KONSTRUKSI (TS) | Indah Ria R., ST., MT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-04-03 17:35:51 |
85 |
1931310093 | FILZA ABITYA | 3 TS 3 | OPTIMASI BIAYA DAN WAKTU PENGGUNAAN ALAT BERAT PADA PEKERJAAN GALIAN DAN TIMBUNAN PROYEK LOT 3 - JEMBATAN KRETEK 2,KABUPATEN BANTUL | MANAJEMEN KONSTRUKSI (TS) | Indah Ria R., ST., MT | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 12:12:27 |
86 |
1931310107 | ANNISA FALAH K.M | 3 TS 2 | ANALISIS PENGGUNAAN ALAT BERAT PADA PROYEK PEMBANGUNAN GEDUNG MALANG CREATIVE CENTER | MANAJEMEN KONSTRUKSI (TS) | Indah Ria R., ST., MT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-04-03 17:35:36 |
87 |
1931330052 | JENI OLVIANI | 3 TKJJBA 1 | Identifikasi Risiko Bahaya Dan Pengendalian Bahaya Pada Pekerjaan Pemasangan Jetty Proyek Pembangunan Muara Sungai Bogowonto Sisi Barat (KSN) YIA | MANAJEMEN KONSTRUKSI (TKJJBA) | Indah Ria R., ST., MT | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 12:05:58 |
88 |
1931330002 | MAF'ULA SALSABILA RAMADHAN | 3 TKJJBA 1 | Analisis ruang parkir offstreet sepedah motor di area parkir mall olympic garden | TRANSPORTASI (TKJJBA) | Ir. Rinto Sasongko, MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 13:27:12 |
89 |
1931330051 | RAHMANDA IBADILLAH | 3 TKJJBA 2 | Evaluasi Kinerja Simpang Bersinyal Jalan Dokter Wahidin Sudirohusodo – Jalan Dokter Sutomo Jombang | TRANSPORTASI (TKJJBA) | Ir. Rinto Sasongko, MT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 16:48:41 |
90 |
1931310025 | Adam Smith | 3 TS 1 | Perencanaan Ulang Struktur Bangunan Atas pada Pembangunan Gedung Malang Creative Center (MCC) | STRUKTUR (TS) | Ir. Sugiharti, MT | | TERDAFTAR | 2022-07-26 00:00:00 | 2022-07-26 11:25:27 |
91 |
1931310037 | M. Alfin Khomaini | 3 TS 1 | PERENCANAAN ULANG STRUKTUR ATAS PADA GEDUNG KELAS POLITEKNIK PUPR SEMARANG | STRUKTUR (TS) | Ir. Sugiharti, MT | | TERDAFTAR | 2022-06-10 00:00:00 | 2022-06-20 11:47:18 |
92 |
1931330044 | Benedicta Aldora Putri | 3 TKJJBA 1 | Pengaruh Parkir On - Street Terhadap Kinerja Jalan Jendral Basuki Rahmat Kota Malang | TRANSPORTASI (TKJJBA) | Johanes Asdhi Poerwanto, ST., MMT | | TERDAFTAR | 2022-03-17 00:00:00 | 2022-03-17 13:24:11 |
93 |
1931310062 | Much Abdul Chalim Faudzi | 3 TS 4 | Strategi Penerapan Keselamatan dan Kesehatan Kerja (K3) Pada Proyek Hotel Exindo 57, Kota Nganjuk | MANAJEMEN KONSTRUKSI (TS) | Joko Setiono, ST., MMT | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 11:46:41 |
94 |
1931310076 | THEDY IRVANSYAH | 3 TS 3 | PENERAPAN SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) PADA PROYEK LOT 3 JEMBATAN KRETEK 2 BANTUL | MANAJEMEN KONSTRUKSI (TS) | Joko Setiono, ST., MMT | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 13:34:50 |
95 |
1931310081 | Jatmiko Cahyo Pambudi | 3 TS 4 | PENERAPAN SISTEM MANAJEMEN K3 PADA PROYEK JALAN NASIONAL PLANJAN-BARON-TEPUS | MANAJEMEN KONSTRUKSI (TS) | Joko Setiono, ST., MMT | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 12:11:16 |
96 |
1931310091 | Fikrie Maulanie Aziz | 3 TS 1 | Keamanan Scaffolding dalam pengecoran pier head p13 ramp 4 wringinanom toll KLBM | MANAJEMEN KONSTRUKSI (TS) | Joko Setiono, ST., MMT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-04-03 17:29:25 |
97 |
1931310100 | Shefa Kinhill Androw | 3 TS 1 | Metode Pelaksanaan Penjadwalan dan Rencana Anggaran Biaya Pembangunan Struktur Gedung Direktorat Poltek PU Kota Semarang | MANAJEMEN KONSTRUKSI (TS) | Joko Setiono, ST., MMT | | TERDAFTAR | 2022-03-29 00:00:00 | 2022-04-03 17:30:27 |
98 |
1931330007 | HAFIDHATUL LAILIYAH | 3 TKJJBA 1 | Penerapan Keselamatan dan Kesehatan Kerja (K3) Pada Pembangunan Jalan Akses 1 Proyek Bendungan Jlantah Kabupaten Karanganyar | MANAJEMEN KONSTRUKSI (TKJJBA) | Joko Setiono, ST., MMT | | TERDAFTAR | 2022-03-28 00:00:00 | 2022-03-28 12:01:51 |
99 |
1931310009 | IPUNG WISNU TRIONO | 3 TS 3 | PERENCANAAN PERKERASAN LENTUR DAN RENCANA ANGGARAN BIAYA PADA PROYEK LINGKAR SELATAN KABUPATEN SAMPANG STA 1+125 – STA 3+800 | TRANSPORTASI (TS) | Marjono, ST., MT | | TERDAFTAR | 2022-02-21 00:00:00 | 2022-02-21 14:27:12 |
100 |
1931310046 | STYFANI YUDIANTO PUTRI | 3 TS 3 | PERENCANAAN PERKERASAN LENTUR DAN RENCANA ANGGARAN BIAYA PROYEK PRESERVASI JALAN SIMPANG PENAWAR – GEDONG AJI BARU – RAWAJITU PROVINSI LAMPUNG PADA STA 9 + 700 – STA 14 + 700 | TRANSPORTASI (TS) | Marjono, ST., MT | | TERDAFTAR | 2022-02-21 00:00:00 | 2022-02-21 14:08:54 |